李淑国.东华水泥钢筋混凝土料仓快速加固修复施工[J].水泥工程,2018,31(2):87-88
东华水泥钢筋混凝土料仓快速加固修复施工
Rapid reinforcement and repair construction of Donghua cement reinforced concrete silo
  
DOI:
中文关键词: 混凝土料仓  快速加固  修复  灌浆料施工
英文关键词: concrete silo  rapid reinforcement  repair  construction of grouting material
基金项目:
作者单位
李淑国 山东东华水泥有限公司 
摘要点击次数: 1543
全文下载次数: 0
中文摘要:
      东华水泥公司配料站石灰石仓内壁磨损严重,采用一种新型混凝土料仓快速修复。施工过程包括料仓基层预处理、仓壁植筋、加固钢板、底部支撑钢板、两侧支撑钢板的处理、灌浆料调制、灌浆施工和养护步骤。该混凝土料仓快速加固修复技术通过对料仓加固修复区域进行在线快速修复,维修过程快速简单,修复强度高。
英文摘要:
      A new type of concrete silo is used for quick repair because the inner wall of the limestone silo at the batching station of Donghua Cement Co., Ltd. is seriously worn. The construction process includes the pretreatment of the silo base, the treatment of planting bar in the silo wall,reinforcement steel plate,bottom supporting steel plate, supporting steel plates on both sides, the preparation of grouting material, the grouting construction and the maintenance steps. The rapid reinforcement and repair technology of the concrete silo achieves quick and easy online repair of the silo reinforcement and repair area. The maintenance process is quick and simple, and the repair strength is high.
查看全文   查看/发表评论  下载PDF阅读器
关闭