HRHQ水泥窑系统局部改造实践
Partial Modification Practice and Scope of HRHQ Cement Kiln System
投稿时间:2025-02-18  修订日期:2025-04-16
DOI:
中文关键词: C1出口改造  压缩气管网和空压机改造  节能减碳
英文关键词: Reconstruction of the outlet of C1 preheater  Renovation of the compressed air pipeline network and air compressors  Energy conservation and carbon reduction
基金项目:
作者单位邮编
封广森* 华润建材科技运营管理部 518000
杨立勇 华润建材科技运营管理部 
摘要点击次数: 2
全文下载次数: 0
中文摘要:
      通过现场踏勘和分析论证,先后对C1下料管、出口管道、撒料板、锁风阀,窑中风机、空压机和管网等进行了局部技术改造,总体投资200万元,实现了C1出口温度下降8°,熟料标煤耗下降0.6kg/t,熟料综合电耗下降2.12kwh/t,年收益107万元,投资回报周期1.87年,效果明显。
英文摘要:
      Through on - site inspections, analysis and demonstration, local technical renovations were successively carried out on the C1 downcomer, outlet pipeline, spreading plate, air - locking valve, mid - kiln fan, air compressor and pipeline network, etc. The total investment was 2 million yuan. As a result, the temperature at the C1 outlet decreased by 8 °C, the standard coal consumption of clinker decreased by 0.6 kg/t, the comprehensive power consumption of clinker decreased by 2.12 kWh/t. The annual revenue reached 1.07 million yuan, and the investment payback period was 1.87 years. The effect is remarkable.