徐洪卫,嵇 磊,吴香香,吴鸿宇,姚瑞宏.CSTR+MBR+双膜法工艺在水泥窑协同处理垃圾项目中的工程应用[J].水泥工程,2022,35(2):79-82 |
CSTR+MBR+双膜法工艺在水泥窑协同处理垃圾项目中的工程应用 |
Engineering application of CSTR+MBR+Double membrane process in cement kiln cooperative waste treatment project |
|
DOI: |
中文关键词: 双膜法 MBR 水泥窑 协同处理 |
英文关键词: |
基金项目: |
|
摘要点击次数: 541 |
全文下载次数: 0 |
中文摘要: |
介绍了溧水天山垃圾协同处置项目中良浆的主要工程设计,采用“CSTR+MBR+双膜法”处理技术。处理规模为3600t/d。运行情况表明该组合工艺COD出水浓度<60 mg/L,BOD5出水浓度<10 mg/L、NH3-N出水浓度<10 mg/L,去除率达99%以上。出水水质达到了《GB/T 19923—2005城市污水再生利用工业用水水质》中敞开式循环冷却水系统补充水标准要求。 |
英文摘要: |
Introduced the main engineering design of good slurry in the Lishui Tianshan Waste Co-processing Project, using the "CSTR+MBR+Double Membrane Method" treatment technology. The processing scale is 360 t/d. The operation conditions show that the COD effluent concentration of the combined process is less than 60 mg/L, the BOD5 effluent concentration is less than 10 mg/L, the NH3-N effluent concentration is less than 10 mg/L, and the removal rate is above 99%. The effluent water quality meets the requirements of the supplementary water standard for the open circulating cooling water system in "GB/T19923—2005 Urban Sewage Recycling Industrial Water Quality". |
查看全文
查看/发表评论 下载PDF阅读器 |
关闭 |