文章摘要
徐基军.2 500 t/d生产线分级燃烧+SNCR脱硝改造优化[J].水泥工程,2020,33(1):83
2 500 t/d生产线分级燃烧+SNCR脱硝改造优化
Discussion on the design of jet grouting pile composite foundation
  
DOI:
中文关键词: 旋喷桩,复合地基,钻机,地勘  地基承载力
英文关键词: jet grouting pile, composite foundation, driling rig  geological prospecting, bearing capacity of foundation
基金项目:
作者单位
徐基军 徐州中联水泥有限公司 
摘要点击次数: 1126
全文下载次数: 1
中文摘要:
      旋喷桩处理地基的方法相关规范有所介绍,但对旋喷桩处理地基的设计没有具体的方法,详细介绍了旋喷桩的设计方法和步骤,结合实际工程案例,对施工中遇到的问题及处理进行了分析,并介绍了采用该方法设计旋喷桩地基的过程。
英文摘要:
      The method of jet grouting pile for foundation treatment is introduced in relevant specifications, but there is no specific method for the design of jet grouting pile foundation treatment. The design method and steps of jet grouting pile are introduced in detail. Combined with practical engineering cases, the problems encountered in construction and treatment are analyzed, and the process of using this method to design the foundation of jet grouting pile is introduced.