At present, the cement industry is overcapacity, and the operating situation is severe, and the low temperature waste heat power generation plant of the cement production line is also facing the same business situation, which need broaden sources of income and reduce expenditure. Therefore, as far as the use of cable concerned, the situation of main use of copper core cable situation could be broke to use alloy cable instead of copper core cable in a certain range. In the premise of ensuring the use performance, it not only can save copper resources, but also to a certain extent, reduce the cost of the project. |