文章摘要
秦学恒.活塞式液压推雪人装置的设计[J].水泥工程,2016,29(1):24-26
活塞式液压推雪人装置的设计
Design of piston hydraulic push snowman device
  
DOI:10.13697/j.cnki.32-1449/tu.2016.01.007
中文关键词: 活塞式  液压推雪人装置  设计  篦冷机
英文关键词: piston  hydraulic push snowman device  design  gate cooler
基金项目:
作者单位
秦学恒 安徽郎溪南方水泥有限公司 
摘要点击次数: 1616
全文下载次数: 1
中文摘要:
      新型干法生产线几乎都遇到过篦冷机长“雪人”情况,影响设备的正常运转。针对这一问题,分析篦冷机雪人的形成原因及清理措施,从设计结构出发,形成了优化后活塞式推雪人装置,介绍了该装置的结构、使用方法及维护。实际应用表明:该装置具有设备结构简单可靠、空间布局合理等优点,彻底解决了推雪人装置头部与篦冷机壳体密封问题,效果较好。
英文摘要:
      The new dry process production lines have almost encountered the situation of ‘Snowman’in grate cooler which affects normal operation. To solve this problem, analyze the causes and clean-up measures ‘Snowman’in grate cooler, starting from the design structure, forming optimized device of piston push snowman.It introduces the device of its structure, use and maintenance. Practical application shows that: the device has a simple and reliable structure, reasonable space layout, etc.and solves sealing problems betweenthe head of push snowman device and cooler housing,which has good effect.
查看全文   查看/发表评论  下载PDF阅读器
关闭