Implementation of waste heat of cement enterprises access system is the main protection measures for waste heat power system and cement enterprise security. The construction of waste heat power generation system, access system requirements and implementation were introduced in detail. After the project completion,the communication system of waste heat system obtained comprehensive improvement, and the two power supply of the large power grid and waste heat power generation unit for the cement production line was realized.