周有均.莱歇立磨安装过程四个关键工序控制[J].水泥工程,2014,27(6):42-44 |
莱歇立磨安装过程四个关键工序控制 |
Four key processes control of Loesche mill installation |
|
DOI:10.13697/j.cnki.32-1449/tu.2014.06.015 |
中文关键词: 立磨基础框架,摇臂立柱,连接桥,找正焊接,减速机底板chock fast 灌注,问题改进措施 |
英文关键词: vertical mill foundation framework, rocker pillar, connecting bridge, alignment and welding, obvious effect |
基金项目: |
|
摘要点击次数: 1498 |
全文下载次数: 0 |
中文摘要: |
介绍了某海外项目安装莱歇生料立磨(LM56.4)的过程中,在进行磨机基础框架、磨辊摇臂立柱和连接桥的找正焊接以及减速机底板chock fast 灌注这四个关键工序施工中遇到的问题。这些问题通过原因查找和施工工艺方法的改进,都得到了很好的解决,从而保证了生料立磨的安装质量;而且这些经验应用于本生产线后续的水泥立磨安装施工中,再次得以肯定,不但安装质量好,而且缩短了计划工时,效果显著。 |
英文摘要: |
Problems in four key construction steps of LM56.4 Loesche mill installation of a overseas project were introduced, the four installation steps are alignment and welding of mill foundation framework,roller rocker pillar and the connecting bridge and chock fast perfusion of reducer floor. By finding cause and improving construction method these problems had been solved, which ensured the installation quality of raw material mill. And the experience were applied in the following installation of cement vertical mill and sucessed again as not only had good installation quality, but also shorten the planned working hours, the effect is obvious. |