罗仙月.露天石灰石矿的开采方案及采准工作面的设计布置[J].水泥工程,2014,27(5):83-86 |
露天石灰石矿的开采方案及采准工作面的设计布置 |
Open-pit limestone mining plan and quasi working face layout design |
|
DOI: |
中文关键词: 5 000 t/d熟料线,石灰石矿山,基建采准工作面,地质条件,资源状况 |
英文关键词: 5 000 t/d clinker line, limestone mine,quasi working face of infrastructure projects, geological conditions, resources status |
基金项目: |
|
摘要点击次数: 1306 |
全文下载次数: 0 |
中文摘要: |
矿山基建采准工作面布置,直接影响到基建工程量、投资费用和施工时间;而基建采准工作面位置的选择与设计布置又是一个系统工程,需考虑各种因素和条件,如山势地形、矿体规模、矿区地质,矿石储量、开采规模等等。以焦作千业水泥有限责任公司5 000 t/d熟料线的谷堆后矿区为例,详细介绍了该矿的储量、地形、矿体、夹层、上部覆盖层等总体概况;在此基础上重点介绍了该矿山基建采准工作面的设计布置情况,包括考虑因素、设计方案和建成后的生产情况。 |
英文摘要: |
The quasi working face layout of mine infrastructure projects directly impacts and its engineering quantities, investment cost and construction time, and the location selecting and layout design is a system engineering, needs to consider various factors and conditions as mountain terrain, orebody scale, geology, ore reserves,mining scale, et al. Jiaozuo Qianye Cement Co.,Ltd. 5000 t/d clinker line Guduihou mine as an example, the general situation of reserves, terrain,ore body,interlayer and upper cover layer was introduced in detail, on that basis, the layout design condition including factors considering,scheme and production situation after completion were introduced. |